Wednesday, January 11, 2017

Analisa Harga Satuan Pekerjaan Sanitasi

Analisa Harga Satuan Pekerjaan Sanitasi


Diposkan : 04 Juni 2014
Oleh : Endang Kusman

No.   URAIAN
SAT
VOLUME
HARGA SAT
HARGA
     

(Rp)
(Rp)
M-01   1 Buah Closet jongkok Porselen Standar
    Closet jongkok
bh
1.00
188,200.00
188,200.00
    P.C (50 gk)
Kg
6.00
1,406.00
8,436.00
    Pasir pasang
m3
0.01
233,400.00
2,334.00
    Pekerja
org
1.0000
42,000.00
42,000.00
    Tukang batu
org
1.5000
65,000.00
97,500.00
    Kepala Tukang
org
1.5000
75,000.00
112,500.00
    Mandor
org
0.1600
80,000.00
12,800.00
    Jumlah


463,770.00
    Dibulatkan


463,770.00
M-02   1 Buah Urinoir



    Urinoir
bh
1.00
1,773,400.00
1,773,400.00
    P.C (50 gk)
Kg
6.00
1,406.00
8,436.00
    Pasir pasang
m3
0.01
233,400.00
2,334.00
    Pekerja
org
1.0000
42,000.00
42,000.00
    Tukang batu
org
1.0000
65,000.00
65,000.00
    Kepala Tukang
org
0.1000
75,000.00
7,500.00
    Mandor
org
0.0010
80,000.00
80.00
    Perlengkapan 30 % harga urinoir
lot
0.3000
1,773,400.00
532,020.00
    Jumlah


2,430,770.00
    Dibulatkan


2,430,770.00
M-03   1 Buah Wastafel



    wastafel standar
unit
1.00
1,012,700.00
1,012,700.00
    P.C (50 gk)
Kg
6.00
1,406.00
8,436.00
    Pasir pasang
m3
0.01
233,400.00
2,334.00
    Pekerja
org
1.2000
42,000.00
50,400.00
    Tukang batu
org
1.4500
65,000.00
94,250.00
    Kepala Tukang
org
0.1500
75,000.00
11,250.00
    Mandor
org
0.1000
80,000.00
8,000.00
    Perlengkapan 12 % harga wastafel
lot
0.1200
1,773,400.00
212,808.00
    Jumlah


1,400,178.00
    Dibulatkan


1,400,178.00
M-04   1 Buah bak Mandi Fibreglass Volume 0,30 m3
    Bak fibreglass 0.60m x 0.60m
bh
1.00
255,300.00
255,300.00
    Pekerja
org
1.8000
42,000.00
75,600.00
    Tukang batu
org
2.7000
65,000.00
175,500.00
    Kepala Tukang
org
0.5400
75,000.00
40,500.00
    Mandor
org
0.1100
80,000.00
8,800.00
    Perlengkapan 18 % harga bak
lot
0.1800
255,300.00
45,954.00
    Jumlah


601,654.00
    Dibulatkan


601,654.00
M-05   1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
    Buis beton Ø 30 cm
bh
1.10
61,700.00
67,870.00
    Bata merah
bh
25.00
775.00
19,375.00
    P.C (50 gk)
Kg
10.300
1,406.00
14,481.80
    Pasir pasang
m3
0.061
233,400.00
14,237.40
    Pasir urug
m3
0.069
175,300.00
12,095.70
    Pekerja
org
0.3800
42,000.00
15,960.00
    Tukang batu
org
0.1900
65,000.00
12,350.00
    Kepala Tukang
org
0.0190
75,000.00
1,425.00
    Mandor
org
0.0190
80,000.00
1,520.00
    Jumlah


159,314.90
    Dibulatkan


159,315.00
M-06   1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm
    Bata merah
bh
186.00
775.00
144,150.00
    P.C (50 gk)
Kg
114.000
1,406.00
160,284.00
    Pasir pasang
m3
0.184
233,400.00
42,945.60
    Batu pecah 2/3
m3
0.033
211,100.00
6,966.30
    Besi beton
m3
4.850
16,500.00
80,025.00
    Pasir beton
m3
0.120
255,400.00
30,648.00
    Pekerja
org
2.1600
42,000.00
90,720.00
    Tukang batu
org
0.7200
65,000.00
46,800.00
    Kepala Tukang
org
0.0720
75,000.00
5,400.00
    Mandor
org
0.1080
80,000.00
8,640.00
    Tukang gali
org
0.1000
42,000.00
4,200.00
    Jumlah


620,778.90
    Dibulatkan


620,779.00
M-07   1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
    Bata merah
bh
53.00
775.00
41,075.00
    P.C (50 gk)
Kg
44.000
1,406.00
61,864.00
    Pasir pasang
m3
0.070
233,400.00
16,338.00
    Batu pecah 2/3
m3
0.070
211,100.00
14,777.00
    Besi beton
m3
1.600
16,500.00
26,400.00
    Pasir beton
m3
0.060
255,400.00
15,324.00
    Pekerja
org
3.2000
42,000.00
134,400.00
    Tukang batu
org
1.0150
65,000.00
65,975.00
    Kepala Tukang
org
0.0015
75,000.00
112.50
    Mandor
org
0.0160
80,000.00
1,280.00
    Jumlah


377,545.50
    Dibulatkan


377,546.00
M-08   1 M' Pipa PVC Ø 1/2" (AW)



    Pipa pvc Ø 1/2"
m'
1.2000
10,025.00
12,030.00
    Pekerja
org
0.0360
42,000.00
1,512.00
    Tukang batu
org
0.0600
65,000.00
3,900.00
    Kepala Tukang
org
0.0060
75,000.00
450.00
    Mandor
org
0.0018
80,000.00
144.00
    Perlengkapan 35 % harga pipa
lot
0.3500
12,030.00
4,210.50
    Jumlah


22,246.50
    Dibulatkan


22,247.00
M-09   1 M' Pipa PVC Ø 1" (AW)



    Pipa pvc Ø 1"
m'
1.2000
15,800.00
18,960.00
    Pekerja
org
0.0360
42,000.00
1,512.00
    Tukang batu
org
0.0600
65,000.00
3,900.00
    Kepala Tukang
org
0.0060
75,000.00
450.00
    Mandor
org
0.0018
80,000.00
144.00
    Perlengkapan 35 % harga pipa
lot
0.3500
18,960.00
6,636.00
    Jumlah


31,602.00
    Dibulatkan


31,602.00
M-10   1 M' Pipa PVC Ø 11/2" (AW)



    Pipa pvc Ø 11/2"
m'
1.2000
26,475.00
31,770.00
    Pekerja
org
0.0360
42,000.00
1,512.00
    Tukang batu
org
0.0600
65,000.00
3,900.00
    Kepala Tukang
org
0.0060
75,000.00
450.00
    Mandor
org
0.0018
80,000.00
144.00
    Perlengkapan 35 % harga pipa
lot
0.3500
31,770.00
11,119.50
    Jumlah


48,895.50
    Dibulatkan


48,896.00
M-11   1 M' Pipa PVC Ø 2" (AW)



    Pipa pvc Ø 2"
m'
1.2000
27,675.00
33,210.00
    Pekerja
org
0.0360
42,000.00
1,512.00
    Tukang batu
org
0.0600
65,000.00
3,900.00
    Kepala Tukang
org
0.0060
75,000.00
450.00
    Mandor
org
0.0018
80,000.00
144.00
    Perlengkapan 35 % harga pipa
lot
0.3500
31,770.00
11,119.50
    Jumlah


50,335.50
    Dibulatkan


50,336.00
M-12   1 M' Pipa PVC Ø 4" (AW)



    Pipa pvc Ø 4"
m'
1.2000
86,975.00
104,370.00
    Pekerja
org
0.0810
42,000.00
3,402.00
    Tukang batu
org
0.1350
65,000.00
8,775.00
    Kepala Tukang
org
0.0135
75,000.00
1,012.50
    Mandor
org
0.0041
80,000.00
328.00
    Perlengkapan 35 % harga pipa
lot
0.3500
104,370.00
36,529.50
    Jumlah


154,417.00
    Dibulatkan


154,417.00
M-13   1 M' Pipa PVC Ø 3/4" (AW)



    Pipa pvc Ø 3/4"
m'
1.2000
13,050.00
15,660.00
    Pekerja
org
0.0810
42,000.00
3,402.00
    Tukang batu
org
0.1350
65,000.00
8,775.00
    Kepala Tukang
org
0.0135
75,000.00
1,012.50
    Mandor
org
0.0041
80,000.00
328.00
    Perlengkapan 35 % harga pipa
lot
0.3500
15,660.00
5,481.00
    Jumlah


34,658.50
    Dibulatkan


34,659.00
M-14   1 Buah Bak Cuci piring Stainless steel
    Bak cuci stainless steel + asesoris lengkap
bh
1.0000
397,800.00
397,800.00
    Pekerja
org
0.0300
42,000.00
1,260.00
    Tukang batu
org
0.3000
65,000.00
19,500.00
    Kepala Tukang
org
0.0300
75,000.00
2,250.00
    Mandor
org
0.0015
80,000.00
120.00
    Jumlah


420,930.00
    Dibulatkan


420,930.00
M-15   1 Buah Kran Ø 1/2" - 3/4"



    Kran air
bh
1.0000
40,900.00
40,900.00
    Seal tape
bh
0.0250
4,200.00
105.00
    Pekerja
org
0.0100
42,000.00
420.00
    Tukang batu
org
0.1000
65,000.00
6,500.00
    Kepala Tukang
org
0.0100
75,000.00
750.00
    Mandor
org
0.0050
80,000.00
400.00
    Jumlah


49,075.00
    Dibulatkan


49,075.00
M-16   1 Buah Floor Drain



    Floor drain
bh
1.0000
66,600.00
66,600.00
    Pekerja
org
0.0100
42,000.00
420.00
    Tukang batu
org
0.1000
65,000.00
6,500.00
    Kepala Tukang
org
0.0100
75,000.00
750.00
    Mandor
org
0.0050
80,000.00
400.00
    Jumlah


74,670.00
    Dibulatkan


74,670.00
M-17   1 M' Grafel beton U 20 cm -60 cm

    Pipa beton U
bh
1.1000
44,300.00
48,730.00
    Bata merah
bh
12.0000
775.00
9,300.00
    P.C (50 gk)
zak
0.1030
1,406.00
144.82
    Pasir pasang
m3
0.0305
233,400.00
7,118.70
    Pasir urug
m3
0.0345
175,300.00
6,047.85
    Pekerja
org
0.0100
42,000.00
420.00
    Tukang batu
org
0.1000
65,000.00
6,500.00
    Kepala Tukang
org
0.0100
75,000.00
750.00
    Mandor
org
0.0050
80,000.00
400.00
    Jumlah


79,411.37
    Dibulatkan


79,411.00
M-18   1 M' Pasang Talang Plastik PVC U 15 cm (AW)
    Talang plastik PVC
m'
1.05000
60,000.00
63,000.00
    Perlengkapan 35 % harga talang
lot
0.3500
63,000.00
22,050.00
    Pekerja
org
0.1500
42,000.00
6,300.00
    Tukang batu
org
0.4000
65,000.00
26,000.00
    Kepala Tukang
org
0.0250
75,000.00
1,875.00
    Mandor
org
0.0013
80,000.00
100.00
    Jumlah


119,325.00
    Dibulatkan


119,325.00
M-19   1 M' Saluran Air Limbah Buis Beton Ø 60 cm

    Buis beton Ø 60 cm
bh
1.10
130,900.00
143,990.00
    Bata merah
bh
25.00
775.00
19,375.00
    P.C (50 gk)
zak
0.206
1,406.00
289.64
    Pasir pasang
m3
0.061
233,400.00
14,237.40
    Pasir urug
m3
0.069
175,300.00
12,095.70
    Pekerja
org
0.3800
42,000.00
15,960.00
    Tukang batu
org
0.1900
65,000.00
12,350.00
    Kepala Tukang
org
0.0190
75,000.00
1,425.00
    Mandor
org
0.0190
80,000.00
1,520.00
    Jumlah


221,242.74
    Dibulatkan


221,243.00
M-20   1 M' Pasang Talang Seng Datar



    Seng pelat 3" x 6"
lbr
0.50000
20,801.00
10,400.50
    Paku
kg
0.01500
23,400.00
351.00
    Kayu kelas II
m3
0.00960
2,850,000.00
27,360.00
    Meni besi
kg
0.2500
30,400.00
7,600.00
    Pekerja
org
0.1500
42,000.00
6,300.00
    Tukang batu
org
0.4000
65,000.00
26,000.00
    Kepala Tukang
org
0.0250
75,000.00
1,875.00
    Mandor
org
0.0013
80,000.00
100.00
    Jumlah


79,986.50
    Dibulatkan


79,987.00
M-21   1 Buah Closet Duduk



    Closet duduk
bh
1.00
1,724,700.00
1,724,700.00
    Pekerja
org
3.3000
42,000.00
138,600.00
    Tukang batu
org
1.1000
65,000.00
71,500.00
    Kepala Tukang
org
0.0010
75,000.00
75.00
    Mandor
org
0.1600
80,000.00
12,800.00
    Perlengkapan 6 % harga closet
lot
0.0600
1,724,700.00
103,482.00
    Jumlah


2,051,157.00
    Dibulatkan


2,051,157.00
M-22   1 Buah Tangki Air fibreglass Volume 1 m3
    Bak fibreglass kapasitas 1 m3
bh
1.00
1,316,400.00
1,316,400.00
    Pekerja
org
3.3000
42,000.00
138,600.00
    Tukang batu
org
1.1000
65,000.00
71,500.00
    Kepala Tukang
org
0.0010
75,000.00
75.00
    Mandor
org
0.1600
80,000.00
12,800.00
    Perlengkapan 6 % harga bak
lot
0.0600
1,316,400.00
78,984.00
    Jumlah


1,618,359.00
    Dibulatkan


1,618,359.00
M-23   1 Unit Septictank 2x1,50x1,50 m + Rembesan
    Galian tanah
m3
4.500
26,252.00
118,134.00
    Pasir urug
m3
0.214
175,300.00
37,514.20
    lantai kerja
m3
2.250
716,798.00
1,612,795.50
    Pas bata adk 1pc : 3ps
m2
15.000
220,267.10
3,304,006.50
    Pelat beton K-225
m3
0.300
6,438,864.00
1,931,659.20
    Plesteran adk 1pc : 3ps
m2
15.000
41,301.82
619,527.30
    Pipa PVC 4" jenis AW
m'
5.400
256,800.00
1,386,720.00
    Pipa GIP 1 1/2"
m'
5.000
46,750.00
233,750.00
    Galian tanah untuk rembesan
m3
3.375
20,000.00
67,500.00
    Pas ijuk
kg
5.400
23,400.00
126,360.00
    Urugan kerikil 3/5
m3
1.050
205,000.00
215,250.00
    Pipa PVC 4" berlubang jenis AW
m'
9.000
36,700.00
330,300.00
    Urugan dan perataan tanah
m3
1.125
34,584.00
38,907.00
    Jumlah


10,022,423.70
    Dibulatkan


10,022,424.00
M-24   1 Unit Septictank 1x1,50x1,50 m + Rembesan
    Galian tanah
m3
2.250
20,000.00
45,000.00
    Pasir urug
m3
0.107
175,300.00
18,757.10
    lantai kerja
m3
1.125
716,798.00
806,397.75
    Pas bata adk 1pc : 3ps
m2
7.500
220,267.10
1,652,003.25
    Pelat beton K-225
m3
0.150
6,438,864.00
965,829.60
    Plesteran adk 1pc : 3ps
m2
7.500
41,301.82
309,763.65
    Pipa PVC 4" jenis AW
m'
9.000
256,800.00
2,311,200.00
    Pipa GIP 1 1/2"
m'
2.500
46,750.00
116,875.00
    Galian tanah untuk rembesan
m3
1.688
20,000.00
33,760.00
    Pas ijuk
kg
2.700
23,400.00
63,180.00
    Urugan kerikil 3/5
m3
0.525
205,000.00
107,625.00
    Pipa PVC 4" berlubang jenis AW
m'
9.000
36,700.00
330,300.00
    Urugan dan perataan tanah
m3
0.563
34,584.00
19,470.79
    Jumlah


6,780,162.14
    Dibulatkan


6,780,162.00
Kembali ke Analisa SNI

Analisa Pekerjaan Bongkaran

Analisa Pekerjaan Bongkaran

XPEKERJAAN BONGKARAN :



















1Bongkar dinding 1/2 batu


M2pekerja

0.2org/hr






mandor

0.01org/hr











2Bongkar dinding 1/2 batu


M3pekerja

2org/hr






mandor

0.1org/hr











3Bongkar batu kali


M3pekerja

1.5org/hr

(tebal < 50 cm)



mandor

0.075org/hr











4Bongkar batu kali


M3pekerja

3org/hr

(tebal < 50 cm)



mandor

0.15org/hr











5Bongkar beton


M3tukang

1.2org/hr






kepala tukang

0.12org/hr






pekerja

6org/hr






mandor

0.3org/hr











6Bongkar beton bertulang


M3tukang

1.6org/hr






kepala tukang

0.16org/hr






pekerja

8org/hr






mandor

0.4org/hr











7Bongkar lantai


M2pekerja

0.1org/hr






mandor

0.01org/hr











8Bongkar plesteran


M2pekerja

0.05org/hr






mandor

0.0025org/hr











9Bongkar atas genteng


M2pekerja

0.02org/hr






mandor

0.01org/hr











10Bongkar karpusan atap genteng


M2pekerja

0.03org/hr






mandor

0.015org/hr











11Bongkar atap seng/asbes


M2tk. Besi

0.05org/hr






pekerja

0.01org/hr











12Bongkar kaso & reng kayu


M2tk. Kayu

0.025org/hr

(kayu tidak dipakai lagi)



ke. Tk. Kayu

0.0025org/hr






pekerja

0.1org/hr






mandor

0.005org/hr











13Bongkar rangka atap kuda-2 kayu


M3tukang kayu

1org/hr






kepala tukang

0.2org/hr











14Bongkar plafond + rangka


M2pekerja

0.04org/hr






mandor

0.02org/hr











15Bongkar lisplank


M'pekerja

0.03org/hr

















mandor

0.015org/hr
16Bongkar kusen pintu


M3tukang

1org/hr






kepala tukang

0.1org/hr











17Bongkar daun pintu


M2pekerja

0.02org/hr






mandor

0.001org/hr











18Bongkar kaca


M2pekerja

0.03org/hr






mandor

0.003org/hr











19Bongkar rabat beton


M2pekerja

0.05org/hr






mandor

0.0025org/hr











20Bongkar bak air teraso


BHpekerja

0.3org/hr






mandor

0.015org/hr